ResinTech RMS is a liquid-applied, seamless roof waterproofing system for exposed roofs: new concrete roof decks and the restoration of existing roofing. Two coats of FLEXCOAT-PU with reinforcing fabric between them form the waterproofing membrane, finished with a UV-stable top membrane — PPM as standard, or HPP for fast turnaround and any colour.
Download the RMS System Data Sheet & Application Guide (PDF)
The RMS Build
| Layer | Product | Film | Notes |
| 1 · Primer (optional) | CBE or TUE | Per primer TDS | Only where the substrate or the adhesion test calls for it |
| 2 · Base membrane, coat 1 | FLEXCOAT-PU (FPU) | 25–28 mils wet | Details reinforced first; 28 mils wet is the FPU maximum per coat |
| 3 · Reinforcement | Polyester reinforcing fabric compatible with FPU | One layer | Concrete decks: full surface. Existing roofing: full surface recommended, not mandatory; always at seams, laps, flashings, drains and transitions |
| 4 · Base membrane, coat 2 | FLEXCOAT-PU (FPU) | 25–28 mils wet | Encapsulates the fabric. Can go on straight away, wet-on-wet, as the fabric is laid |
| 5 · Top membrane — standard | PPM (medium grey) | 18–20 mils wet, one coat | Never more than 20 mils over FPU |
| 5 · Top membrane — fast option | HPP (field-tinted to any colour) | 10–15 mils wet | Fast return to service; keep within 10–15 mils over FPU |
| 6 · Colour finish (optional, over PPM) | HPP or TCU | Per product TDS | Where a set long-term colour or gloss is required over PPM |
Total membrane before any optional finish: about 50–56 mils wet of FPU plus fabric, then 18–20 mils wet of PPM (≈ 68–76 mils wet in all) or 10–15 mils wet of HPP (≈ 60–71 mils wet in all). Use a wet-film gauge on every coat.
PPM or HPP on Top?
| PPM — standard | HPP — fast option | |
| Chemistry | Single-component, moisture-cured, UV-stable polyurea | Two-component polyaspartic, 1:1 by weight |
| Film over FPU | 18–20 mils wet, one coat — never more than 20 | 10–15 mils wet |
| Colour | Medium grey | Clear or field-tinted to any colour |
| Typical cure | Tack-free 2–3 h; through-dry ~9 h; full cure 24–48 h (20 °C / 50% RH) | Tack-free ~1 h; light foot traffic 3–4 h; rain protection 6–12 h; full cure 5–7 days (23 °C / 50% RH) |
| Application temperature | Substrate ≥ 3 °C above dew point; cure slows in cold, dry conditions | Substrate 10–30 °C, air 10–32 °C, up to 85% RH |
| Choose it when | Medium grey is acceptable and a flexible, UV-stable polyurea top is wanted | The roof must be back in service fast, or any colour other than grey is required |
Where RMS Fits
| Roof condition | System |
| New exposed concrete roof deck, with or without occupied space below, no regular traffic | RMS, full-surface fabric |
| Existing roofing — restoration or re-cover, no regular traffic | RMS, fabric recommended; adhesion test patch first |
| Rooftop pedestrian terrace | PTS+ |
| Rooftop parking over occupied space | VTS-D+ |
RMS is a roof waterproofing system, not a traffic surface. Roofs that will carry regular foot or vehicle traffic take the ResinTech traffic coating systems.
Material Quantities per 1,000 ft²
| Item | Film | Theoretical coverage | Per 1,000 ft² |
| FLEXCOAT-PU, both coats | 56 mils wet total | ≈ 100–120 ft² per 20 kg pail | ≈ 8.5–10 pails (20 kg) |
| Reinforcing fabric | One layer | Roof area plus laps and details | ≈ 1,000 ft² plus laps |
| PPM (standard top) | 18–20 mils wet | ≈ 210–235 ft² per 10 L pail | ≈ 4.3–4.7 pails (10 L) |
| HPP (fast top) | 10–15 mils wet | ≈ 280–415 ft² per 10 L kit | ≈ 2.4–3.6 kits (10 L) |
Theoretical figures for a smooth substrate, before waste, profile, fabric take-up and detail losses. Granule-surfaced and rough existing roofs take noticeably more. Order from a measured take-off and confirm by mock-up.
Installation Sequence
- Assess the roof — substrate, drainage, moisture, joints, drains, upstands and penetrations. Movement joints get a project-specific detail; the field membrane must not bridge them on its own.
- Prepare — concrete: remove laitance, contaminants and loose material and repair defects. Existing roofing: clean, remove loose granules and failed coatings, repair splits, blisters, open laps and wet areas, let it dry, and make an adhesion test patch.
- Prime if needed — CBE or TUE on porous, marginal or moisture-risk substrates, or wherever the test patch shows it is needed.
- Detail first — reinforce corners, drains, junctions, upstands, penetrations, transitions and existing seams with FPU and fabric.
- FPU coat 1 — 25–28 mils wet; never more than 28 mils in one coat.
- Fabric — roll it into the fresh coat until fully wetted out; lap side joints at least 3 in (75 mm) and end joints at least 6 in (150 mm).
- FPU coat 2 — 25–28 mils wet, wet-on-wet as the fabric is laid or once coat 1 can be recoated; fully encapsulate the fabric and repair any pinholes or thin spots.
- Top membrane — PPM one coat at 18–20 mils wet, or HPP at 10–15 mils wet, once the FPU can be recoated and within 72 hours.
- Cure, protect and record — keep the roof closed and protected from rain and standing water until cured; record batches, film builds and weather.
Site Conditions
| Condition | Requirement |
| Temperature | FPU: substrate 5–35 °C. HPP: substrate 10–30 °C, air 10–32 °C. PPM cure slows in cold, dry conditions |
| Dew point | Substrate at least 3 °C above dew point during application and cure |
| Weather | Dry, stable conditions; protect from rain, condensation and standing water before cure |
| Concrete deck | Minimum 28-day cure; sound, clean and dry; 3,600 psi compressive and 220 psi tensile pull-off recommended |
| Existing roofing | Sound, dry, clean and firmly bonded; adhesion test patch before the full application; confirm the existing roof type with ResinTech |
Limitations
- Not a traffic or wear surface — use PTS+ or VTS-D+ where the roof carries regular foot or vehicle traffic.
- FLEXCOAT-PU stays tacky and is not designed to be exposed; always cover it with PPM or HPP.
- Top membrane over FPU: PPM one coat of 18–20 mils wet, never more than 20; HPP 10–15 mils wet.
- Provide positive drainage; service under ponding or standing water is not covered by the RMS data sheet.
- Do not bridge expansion or active movement joints with field membrane alone.
- PPM is not a vapour barrier and is not for negative-side hydrostatic pressure without additional design measures.
Documents
- ResinTech RMS — System Data Sheet & Application Guide (RT-RMS Rev. 1.0)
- FLEXCOAT-PU (FPU) Technical Data Sheet — TDS-FPU-1.1
- PPM Technical Data Sheet — TDS-PPM v2.3
- HPP Technical Data Sheet — TDS-HPP-1.1
Pricing a Roof?
Canopus Supply stocks FLEXCOAT-PU, PPM and HPP in North Vancouver. Send your roof area, substrate and top-coat choice and we will price the materials from the quantities above. Call 1 (250) 233-3000 or email order@canopussupply.com.
RMS materials: FLEXCOAT-PU · PPM · HPP · TCU · CBE · TUE · ResinTech Traffic Coating Systems
Canopus Supply Inc. — Authorised ResinTech Distributor, Metro Vancouver & BC